Southwest Airlines flights from Nashville (BNA) to Pittsburgh (PIT).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Thu 09:30 Nashville (BNA) 12:00 Pittsburgh (PIT)
Southwest Airlines WN 680 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2025-11-27
Thu 14:15 Nashville (BNA) 16:45 Pittsburgh (PIT)
Southwest Airlines WN 683 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2025-11-27
Tue,Wed 19:40 Nashville (BNA) 22:10 Pittsburgh (PIT)
Southwest Airlines WN 1059 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-10 through 2025-07-30
Sat 20:40 Nashville (BNA) 23:10 Pittsburgh (PIT)
Southwest Airlines WN 1059 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-06-07 through 2025-08-02
Sun 20:50 Nashville (BNA) 23:20 Pittsburgh (PIT)
Southwest Airlines WN 1059 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-06-08 through 2025-08-03
Mon,Thu,Fri 09:15 Nashville (BNA) 11:45 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 09:15 Nashville (BNA) 11:45 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-07-07 through 2025-08-04
Sun 09:30 Nashville (BNA) 12:00 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-06-08 through 2025-08-03
Fri 10:10 Nashville (BNA) 12:45 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2025-07-04
Sat 11:30 Nashville (BNA) 14:00 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-07 through 2025-08-02
Tue,Wed 16:25 Nashville (BNA) 18:55 Pittsburgh (PIT)
Southwest Airlines WN 1254 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-06-10 through 2025-07-30
Mon,Thu,Fri 09:30 Nashville (BNA) 12:00 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-08-07 through 2025-09-29
Tue,Wed 14:00 Nashville (BNA) 16:35 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-08-05 through 2025-10-01
Fri 15:30 Nashville (BNA) 18:00 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2025-07-04
Mon,Thu,Fri 16:20 Nashville (BNA) 18:50 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 16:20 Nashville (BNA) 18:50 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-07-07 through 2025-08-04
Sun 17:15 Nashville (BNA) 19:45 Pittsburgh (PIT)
Southwest Airlines WN 1257 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-08 through 2025-08-03
Tue,Wed 09:25 Nashville (BNA) 11:55 Pittsburgh (PIT)
Southwest Airlines WN 1261 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-10 through 2025-07-30
Mon,Thu,Fri 15:45 Nashville (BNA) 18:20 Pittsburgh (PIT)
Southwest Airlines WN 1261 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-08-07 through 2025-09-29
Mon,Thu,Fri 20:35 Nashville (BNA) 23:05 Pittsburgh (PIT)
Southwest Airlines WN 1261 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 20:35 Nashville (BNA) 23:05 Pittsburgh (PIT)
Southwest Airlines WN 1261 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2025-07-07 through 2025-08-04
Sun 17:05 Nashville (BNA) 19:40 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-08-10 through 2025-08-24
Sun 17:05 Nashville (BNA) 19:40 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-09-07 through 2025-09-28
Sat 17:20 Nashville (BNA) 19:55 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737-800 (73H) 1:35 Effective 2025-08-09 through 2025-09-27
Sun 18:30 Nashville (BNA) 21:05 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2025-08-31
Tue,Wed 18:45 Nashville (BNA) 21:20 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-08-05 through 2025-10-01
Mon,Thu,Fri 18:55 Nashville (BNA) 21:30 Pittsburgh (PIT)
Southwest Airlines WN 1264 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-08-07 through 2025-09-29
Sun 09:15 Nashville (BNA) 11:50 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2025-11-30
Mon,Thu,Fri,Sun 09:45 Nashville (BNA) 12:20 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 09:45 Nashville (BNA) 12:20 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-11-21 through 2025-11-28
Fri,Sun 09:45 Nashville (BNA) 12:20 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-12-07 through 2025-12-14
Thu 09:45 Nashville (BNA) 12:20 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Operates only on 2025-12-18
Mon 09:45 Nashville (BNA) 12:20 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Operates only on 2026-01-05
Sat 10:00 Nashville (BNA) 12:40 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2025-11-08 through 2025-11-15
Sat 10:00 Nashville (BNA) 12:40 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2025-12-06 through 2025-12-13
Tue,Wed 15:15 Nashville (BNA) 17:45 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-04 through 2025-11-12
Mon-Thu 15:15 Nashville (BNA) 17:45 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-17 through 2025-11-20
Mon-Fri 15:15 Nashville (BNA) 17:45 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-02 through 2025-12-11
Mon-Wed 15:15 Nashville (BNA) 17:45 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-15 through 2025-12-17
Wed,Thu 15:15 Nashville (BNA) 17:45 Pittsburgh (PIT)
Southwest Airlines WN 1270 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-24 through 2026-01-01
Mon-Wed 15:45 Nashville (BNA) 18:15 Pittsburgh (PIT)
Southwest Airlines WN 1272 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 15:45 Nashville (BNA) 18:15 Pittsburgh (PIT)
Southwest Airlines WN 1272 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-12-19 through 2026-01-04
Tue,Wed 09:55 Nashville (BNA) 12:30 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-11-04 through 2025-11-12
Mon-Thu 09:55 Nashville (BNA) 12:30 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-11-17 through 2025-11-20
Mon-Fri 09:55 Nashville (BNA) 12:30 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-12-02 through 2025-12-11
Mon-Wed 09:55 Nashville (BNA) 12:30 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-12-15 through 2025-12-17
Wed,Thu 09:55 Nashville (BNA) 12:30 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-12-24 through 2026-01-01
Sat 17:05 Nashville (BNA) 19:40 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-11-08 through 2025-11-15
Sat 17:05 Nashville (BNA) 19:40 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-12-06 through 2025-12-13
Mon,Thu,Fri,Sun 19:40 Nashville (BNA) 22:15 Pittsburgh (PIT)
Southwest Airlines WN 1276 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2025-11-02 through 2025-11-16
Ad flat here 8924483383 I FlightInfo Lower
Parallax here BNA-PIT
1 2 3   next


Southwest Airlines flights from Nashville (BNA) to Pittsburgh (PIT).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-09 through 2025-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here BNA-PIT
Page 1 / 3        next
  • A domestic route departing from the Nashville airport (BNA) and arriving at Pittsburgh airport (PIT).
  • The flight distance is 461 miles, or 742 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 1:30 and 1:40.