FLIGHT SCHEDULE |
---|
Direct Flights: |
Mon
23:05
Tenerife-Sur (TFS)
03:35
Glasgow (GLA) M TUI Airways TOM 1173 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective from 2025-05-05 The flight arrives 1 day after departure. This is a Charter flight. |
Tue
21:05
Tenerife-Sur (TFS)
01:35
Glasgow (GLA) M TUI Airways TOM 1289 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Valid until 2025-05-06 The flight arrives 1 day after departure. This is a Charter flight. |
Tue
21:05
Tenerife-Sur (TFS)
01:35
Glasgow (GLA) M TUI Airways TOM 1289 Non-stop Boeing 737-800 (7S8) 4:30 Operates only on 2025-05-13 The flight arrives 1 day after departure. This is a Charter flight. |
Tue
21:05
Tenerife-Sur (TFS)
01:35
Glasgow (GLA) M TUI Airways TOM 1289 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective 2025-05-20 through 2025-09-30 The flight arrives 1 day after departure. This is a Charter flight. |
Tue
23:50
Tenerife-Sur (TFS)
04:20
Glasgow (GLA) M TUI Airways TOM 1289 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective from 2025-10-07 The flight arrives 1 day after departure. This is a Charter flight. |
Thu
23:20
Tenerife-Sur (TFS)
03:50
Glasgow (GLA) M TUI Airways TOM 1429 Non-stop Boeing 787-8 (788) 4:30 Effective 2025-05-08 through 2025-10-16 The flight arrives 1 day after departure. This is a Charter flight. |
Fri
23:00
Tenerife-Sur (TFS)
03:30
Glasgow (GLA) M TUI Airways TOM 1573 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective 2025-05-02 through 2025-09-26 The flight arrives 1 day after departure. This is a Charter flight. |
Fri
23:50
Tenerife-Sur (TFS)
04:20
Glasgow (GLA) M TUI Airways TOM 1573 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective from 2025-10-03 The flight arrives 1 day after departure. This is a Charter flight. |
Sat
20:40
Tenerife-Sur (TFS)
01:10
Glasgow (GLA) M TUI Airways TOM 1687 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective from 2025-05-24 The flight arrives 1 day after departure. This is a Charter flight. |